The Lac Brule Project is comprised of 36 claims, covering 2,016 hectares within the Labrieville Anorthosite Complex. The Project is road accessible, approximately 64 km from Labrieville (30 km in a straight line), on the north shore of the St. Lawrence River, 100 km north of Forestville, near the Bersimis 2 power generation site.
Historic drilling conducted across 2 mineralized lenses.
Favorable mineralization for the application ORF TiO2 technology proved to be 144.8% more cost-efficient than conventional processes.
Historic metallurgical bench tests attained 94% TiO2, 95% V2O5 and 99% iron oxides successfully leached.
Project Location
Location: Quebec, Canada
Latitude: 49.372415
Longitude: -69.556853
BOXCUT
Get your mining services discovered by mining companies, faster.